Activity (project)
From PEaM
| PMI | Activity is a component of work performed during the course of a project.[1] |
|---|
| AACEI | An activity is an operation or process consuming time and possibly resources (with the exception of dummy activities). An activity is an element of work that must be performed in order to complete a project. An activity consumes time, and may have resources associated with it. Activities must be measurable and controllable. An activity may include one or more tasks. (6/07)[2] |
|---|
See also
References
- ↑ Project Management Institute (2008). A Guide to The Project Management Body of Knowledge, 4th, Project Management Institute.
- ↑ Association for the Advancement of Cost Engineering International [AACEI] (2007). Cost Engineering Terminology, 10S-90, Association for the Advancement of Cost Engineering International.
| This article contains text from the Project Management Institute PM Body of Knowledge which is copyright all rights reserved by Project Management Institute, Inc. (PMI). Project Management Body of Knowledge is a registered trademark of PMI |
| This article contains text from the Association for the Advancement of Cost Engineering website which is copyright all rights reserved by Association for the Advancement of Cost Engineering International (AACEI). |