Activity code

From PEaM

Jump to:navigation, search
PMI Activity code is one or more numerical or text value that identify characteristics of the work or in some way categorize the schedule activity that allows filtering and ordering of activities within reports.[1]
AACEI Activity code is an alphanumeric designation system, with code(s) assigned to an activity to group or categorize its properties. Coding is used for detail and summary reporting purposes.[2]

See also

References

  1. Project Management Institute (2008). A Guide to The Project Management Body of Knowledge, 4th, Project Management Institute.
  2. Association for the Advancement of Cost Engineering International [AACEI] (2007). Cost Engineering Terminology, 10S-90, Association for the Advancement of Cost Engineering International.
PMBOK-4th.gif
This article contains text from the Project Management Institute PM Body of Knowledge which is copyright all rights reserved by Project Management Institute, Inc. (PMI). Project Management Body of Knowledge is a registered trademark of PMI
Aace2003logo.jpg
This article contains text from the Association for the Advancement of Cost Engineering website which is copyright all rights reserved by Association for the Advancement of Cost Engineering International (AACEI).
Navigation
Toolbox
Print/export