PMI A schedule baseline is a specific version of the schedule model used to compare actual results to the plan to determine if preventive or corrective action is needed to meet the project objectives.[1]
AACEI A baseline schedule[2] is:
  1. A fixed project schedule that is the standard by which project performance is measured. The current schedule is copied into the baseline schedule that remains frozen until it is reset. Resetting the baseline is done when the scope of the project has been changed significantly, for example after a negotiated change. At that point, the original or current baseline becomes invalid and should not be compared with the current schedule.
  2. Version of schedule that reflects all formally authorized scope and schedule changes.[3]

References

  1. Project Management Institute (2008). A Guide to The Project Management Body of Knowledge, 4th, Project Management Institute.
  2. Association for the Advancement of Cost Engineering International [AACEI] (2007). Cost Engineering Terminology, 10S-90, Association for the Advancement of Cost Engineering International.
  3. Westinghouse Savannah River Company EVMS Pocket Guide
PMBOK-4th.gif
This article contains text from the Project Management Institute PM Body of Knowledge which is copyright all rights reserved by Project Management Institute, Inc. (PMI). Project Management Body of Knowledge is a registered trademark of PMI
Aace2003logo.jpg
This article contains text from the Association for the Advancement of Cost Engineering website which is copyright all rights reserved by Association for the Advancement of Cost Engineering International (AACEI).
Navigation
Toolbox
Print/export